HOPE HP20 excavator hammer

The HP20 excavator hammer is designed for mechanized breaking of thick concrete, foundation structures, old pavements, hard rock and soil, as well as large construction debris. The product uses the excavator's hydraulic system to power the impact components, and it's ideal for medium to large projects like demolition, road upgrades, stone processing, and site clearing. You can match it with mounting brackets, hoses, chisels, external protection, and your brand details depending on the host machine size, hydraulic conditions, onsite materials, and working hours. For specific compatibility and impact performance, refer to the HP20 model technical documentation.
Recommended Use Areas
Large foundations and structure demolition: Suitable for thick foundations, concrete beams and columns, walls, and floor structures.
Road and bridge surface renewal: Used for removing old concrete slabs, curbs, partial bridge structures, and hard pavements.
Hard rock and soil treatment: Helps break through localized rocks, weathered layers, and tough obstacles.
Quarry reshaping: For crushing or resizing blocks of stone that meet the required dimensions.
Post-demolition clearing: Handles leftover concrete blocks, bricks, and hard waste from building demolition.

Technical Specifications
0.5–18 Ton Excavators
|
Models |
HP05 |
HP10 |
HP20 |
HP30 |
HP35 |
HP40 |
HP43 |
HP45 |
HP50 |
HP60 |
|
|
Weight (kg) |
110 |
140 |
180 |
195 |
310 |
365 |
370 |
480 |
635 |
940 |
1450 |
|
Length (mm) |
1050 |
1130 |
1310 |
1430 |
1460 |
1630 |
1630 |
1850 |
2090 |
2265 |
2650 |
|
Required oil flow (l/min) |
10-25 |
15-25 |
20-30 |
25-50 |
36-60 |
40-70 |
40-70 |
50-90 |
80-110 |
80-110 |
90-120 |
|
Operating Pressure (kg/cm²) |
80-110 |
90-120 |
90-120 |
90-120 |
100-130 |
110-140 |
110-140 |
120-150 |
150-170 |
150-170 |
150-170 |
|
Impact rate (b.p.m) |
900-1400 |
800-1400 |
700-1200 |
600-1100 |
600-1000 |
500-900 |
500-900 |
500-800 |
350-700 |
350-700 |
350-650 |
|
Hose diameter (inch) |
1/2 |
1/2 |
1/2 |
1/2 |
1/2 |
1/2 |
1/2 |
1/2 |
3/4 |
3/4 |
1 |
|
Chisel diameter (mm) |
35 |
40 |
45 |
53 |
60 |
68 |
70 |
75 |
85 |
100 |
125 |
|
Suitable Carrier (ton) |
0.5-2 |
0.8-2.5 |
1.2-3 |
2.5-4 |
3-5 |
4-7 |
4-7 |
5-8 |
9-14 |
10-16 |
15-18 |
18–100 Ton Excavators
|
Models |
HP81N |
HP81 |
HP100 |
HP121 |
HP131 |
HP151 |
HP185 |
HP195 |
HP205 |
HP210 |
HP215 |
|
Weight (kg) |
1680 |
1970 |
2430 |
2750 |
3100 |
4100 |
4600 |
5400 |
6500 |
7100 |
7400 |
|
Length (mm) |
2680 |
2830 |
2860 |
3070 |
3250 |
3770 |
3910 |
3980 |
4110 |
4250 |
4380 |
|
Required oil flow (l/min) |
120-150 |
120-180 |
150-190 |
180-240 |
200-250 |
200-260 |
220-270 |
250-310 |
290-340 |
320-360 |
340-380 |
|
Operating Pressure (kg/cm²) |
160-180 |
160-180 |
160-180 |
160-180 |
180-200 |
180-200 |
220-270 |
260-300 |
270-300 |
270-300 |
270-300 |
|
Impact rate (b.p.m) |
350-600 |
350-550 |
350-500 |
300-450 |
250-400 |
200-350 |
200-250 |
180-200 |
150-200 |
100-150 |
90-130 |
|
Hose diameter (inch) |
1 |
1 |
1 |
1 |
5/4 |
5/4 |
5/4 |
5/4 |
5/4 |
5/4 |
5/4 |
|
Chisel diameter (mm) |
135 |
140 |
150 |
155 |
165 |
175 |
185 |
195 |
205 |
210 |
215 |
|
Suitable Carrier (ton) |
18-25 |
19-26 |
27-35 |
28-35 |
30-40 |
35-45 |
40-55 |
45-60 |
55-65 |
60-80 |
65-100 |
FAQ
Q: What kinds of large or high-strength materials are excavator hammers suitable for handling?
A: Suitable for thicker concrete foundations, building beams and columns, concrete pavements, bridge deck structures, hard rock layers, weathered rock, and large chunks of construction waste. For materials that are harder, larger, or require continuous crushing, you should consider the material's thickness, block size, fractures, and the space available on-site to confirm if it's actually usable.
Q:What kind of excavator does the HP20 need to match?
A: Matching the HP20 can't just be based on the excavator's tonnage. You also need to check the main machine model, bucket arm installation dimensions, pin diameter, pin center distance, ear plate width, overall machine stability, counterweight, and installation space. Before purchasing, it's recommended to provide the excavator's nameplate, connection dimensions, and on-site photos so the manufacturer can confirm the connection frame and overall machine compatibility.
Q:What should you pay attention to when doing continuous reloading work on an HP20?
A: Before continuous operation, you should check the lubrication, hydraulic oil temperature, oil pipe joints, connecting pins, bushings, drill rods, and fasteners. When using the equipment, avoid dry hits, prying sideways, lateral twisting, and overload impacts, and plan shutdown inspections based on actual working hours. If you notice weakened impacts, unusual noises, oil leaks, excessive temperature rise, or loose parts, stop working immediately and carry out maintenance.
Hot Tags: excavator hammer, China excavator hammer manufacturers, suppliers, factory, hydraulic breaker, hydraulic hammer attachment, hydraulic jack hammer, Side Mounted Hydraulic Hammer, Skid Loader Rock Breaker, Top Type Hydraulic Hammer











